Monday, September 28, 2009

Tumbler finished

Tyler will be 2 months tomorrow! I also have to go back to work then :( I really don't want to, it's not a place I really want to work at anymore. But I guess I don't have much of a choice right now.








Then there is my Friday pick. It was one in the tumbler top, but a neat piece.













And finally, the tumbler top. I would love to make this pattern again, now that I worked out a few bugs in my practiced one. Can any one see my flaw-2 next to each other? My hubby asked who it's for, no one. Which is my new problem- I don't really have a reason to make more quilts, other than to keep me sane.


I also have a question-- I am thinking this would be a neat on to machine quilt. Stitch in the ditch, I think it's called. Can I do that without a walking foot? Any tips?

Thursday, September 24, 2009

Baby quilt
















Here is the baby quilt I put together for my co-worker. I like to make a four patch using flannel for the front and back, then not use a batting. They are nice and warm and still light for carrying around. I just love the little turtles! Now I can get back to my tumblers. I also got the back piece sewn for the scrappy brick top. When I get a chance, I will have to put it on the frame to tie it. I'm not sure where all I should tie, I might do one full row, then skip one and do the next. ??? Any suggestions?

Wednesday, September 23, 2009

I found this on someone else's blog, and had to post. I wondered what some of these meant before :)

Quilters' Acronyms

  • BOB = Beginner's Only Block (swap)
  • BOM = Block of the Month
  • DSM = Domestic Sewing Machine
  • DWR = Double Wedding Ring
  • FART = Fabric Aquisition Road Trip
  • FIU = Finish It Up
  • FQ = Fat Quarter
  • HST = Half-Square Triangle
  • HSY = Haven't Started Yet
  • LAQ= Long Arm Quilter
  • LQS = Local Quilt Shop
  • MAQ = Mid-Arm Quilter
  • OBW = One-Block Wonder
  • PHD = Project Half Done
  • PIGS = Projects in Grocery Sacks
  • SABLE = Stash Accumulation Beyond Life Expectancy
  • SEX = Stash Enhancing eXperience (or eXcursion)
  • STASH = Special Treasures All Secretly Hidden
  • TGIF = Thank God It's Finished!
  • TOT = Tone-on-Tone
  • UFO = UnFinshed Object
  • WHIMM = Works Hidden In My Mind
  • WIP = Work In Progress
  • WISP = Work In Slow Progress
  • WIVSP = Work In Very Slow Progress
  • WIWMI = Wish It Would Make Itself
  • WOF = Width of Fabric
  • WOMBAT = Waste of Money, Batting, and Time
  • WOW = White On White
  • WWIT = What Was I Thinking

Quilters' Terms (Not Acronyms)

  • Charms - Small pieces of fabric in squares, hexagons or other shapes, all different fabrics. Charm packs are big sellers right now.
  • Fat Eighth - 1/4 yd of material, cut up the fold. About 9" x 22".
  • Fat Quarter - This is 1/2 yard of fabric with a cut up the fold, creating a piece about 18" x 22".
  • Flimsy - Quilt top waiting to be quilted
  • Frogging - or Unsewing. When you have to redo something and you "rippit, rippit, rippit."
  • Honey Buns - 1.5" x 44" strips of fabric all from one line. Currently made by Moda.
  • Jelly Roll - 2-1/2" strips of fabric from an entire line.
  • Layer Cake - This is a 10" square of fabric from each material in the line.
  • Leaders and Enders - Chain piecing at the beginning and end of another project row. Essentially making two quilts at once and being efficient.
  • Nickel - A 5" square of fabric.
  • Squishie - Envelopes or baggies filled with swap fabric or blocks.
  • YoYo - A circle of fabric which is gathered to form a puffy circle.

Saturday, September 19, 2009

A great getaway










































My husband and I went up North yesterday. My parents were able to watch the kid
s. We went to a mini golf course in the afternoon, stopped at some old time shops, one of them being a candy store. The owner told me I had to be the happiest person in the store, and I probably was- very much the kid in the candy store feeling. After that, we drove through Hackensack, and I spotted a quilt shop. I am very glad I made Brian turn around. There were some ladies talking about a quilt show, and I asked them where it was. Turns out the casino we were planning on staying at was hosting a quilt show as well! We got there too late yesterday to go, but I did get to take a quick walk through this morning.

Wednesday, September 16, 2009

Cutting tumblers

I got a few things done today. I had a quilt on the frame that I was tying, and got that completed. Then I cut all my strips for my tumblers. Once I made my template, I cut one to see what it would look like. I think they will be fast to get cut. Tomorrow the boys will be at daycare part of the day, so hopefully I will get more work done.

Tuesday, September 15, 2009

More fabric


I picked up these pieces today. My next project will be a tumbler quilt, and will be using these and a few prints from my stash. I had been hoping to not buy any more for as long as I could, but there was a sale I didn't want to miss.

Saturday, September 12, 2009

Scrappy Bricks




Today I got a chance to start sewing my bricks together for my scrappy brick top. The boys were good long enough that I made some serious progress. I did change my mind on the layout, so it will be a little smaller than first planned. The pattern I found and was sort of following said to have a row of all rectangles, then a row with a square on each end to off set the bricks. I have decided to have a square on one end of each row. This way I won't have to keep track of Row A and Row B.